loading

Teppanyaki equipment outside decoration ( Marble) Installation steps industry information | | oven furnace grilled fish, roast mutton stove, grill, pizza oven - The artisan roast

by:Longzhao BBQ     2021-03-08
1, after the equipment is in place, determine the position of the marble installation and level adjusting. 2, good screwed marble support, put the marble on the outside of the equipment support, there will be no edge grinding side of outer layering of embedded devices. If not smooth marble mesa, be in mat under the suitable thickness of the wood. 3, adjust the marble seams and smoothness. 4, fixed rubber for the marble and volatile mix well after seams to marble. 5, in teppanyaki equipment and marble mesa place, bracket and marble mesa place marble on special fixed glue. 6, fixed in marble glue not completely cured before, with the wallpaper knife redundant marble glue is cut off, and then with a wet cloth to wipe clean. Next article: take safety zhi when gas teppanyaki equipment operating procedures? A: how about cleaning teppanyaki equipment?
Custom message
Chat Online 编辑模式下无法使用
Chat Online inputting...